Berkeley · North Shattuck · Policy research

Make the courtyard block a normal way to build.

Berkeley needs a coordinated path for a block of modest, independent buildings around a protected garden—with enough housing capacity, workable ownership and predictable approvals.

Source review: October 20, 2026 · 26 findings · 22 primary sources · Initial research; editorial review pending

The key distinction: Berkeley already has important reforms. Residential parking minimums are removed in the relevant commercial districts, and C-NS mixed-use residential projects have no maximum FAR. The larger task is to make height, party walls, gardens, parcel boundaries and phasing work together. Required parking spaces · North Shattuck Commercial district

The reform package

The target is a real urban block: street-facing buildings with individual entrances, connected street walls and a useful shared green interior. These recommendations are Courtyard Urbanist policy proposals, distinct from current law.

  1. An objective courtyard-block option

    Approve the overall street wall, garden, access, affordability and infrastructure plan once. Allow separate, conforming buildings to proceed in phases. This needs a defined local approval route; it should not depend on repeatedly negotiating the same form through separate use permits. Commercial district use permits · Additional commercial district permits

  2. A coordinated five-to-six-story envelope

    C-NS mixed use starts at three stories and 35 ft, even though its residential mixed-use FAR is uncapped. Set a realistic envelope for modest buildings around a substantial garden. Apply transitions at the true outside edge of the block and test daylight in the court. Do not force every internal building to behave like a detached house. North Shattuck Commercial district

  3. Party walls and a useful garden, rather than residual side yards

    Permit blind, code-compliant party walls within the coordinated block. Keep separation where windows genuinely face one another. Resolve how the C-NS separation footnote applies to several buildings on one site versus independent buildings on adjoining legal lots. Provide an explicit shared-court credit after subdivision, secured by permanent access and maintenance obligations. North Shattuck Commercial district · Setbacks and coordinated building groups · Usable open space

  4. Modest parcels within a larger approved block

    The existing special small-lot route applies parent-parcel standards and supports multiple ownership forms, but stops at ten homes. Use that logic to design a larger-block process; do not pretend SB 684 authorizes the entire North Shattuck concept. Ordinary larger maps remain possible and need a predictable coordinated procedure. Small-lot subdivision eligibility · Parent-parcel standards, shared access and ownership

  5. Retail where it belongs; front-door homes where they belong

    Keep the principal shopping street active, with grocery and neighborhood retail space and workable deliveries. Designate quieter frontages for homes with stoops and vestibules. Amend the C-NS 20 ft setback for ground-floor dwellings where that rule prevents the chosen residential frontage. North Shattuck Commercial district

  6. A state pathway for compact point-access buildings

    A five-to-six-story zoning envelope does not establish permission for one stair. Pursue an adopted state code pathway with explicit fire-safety and accessibility conditions; test interim compliant alternatives. The State Fire Marshal’s four-story recommendation is a policy step, not permission for the five-to-six-story study. Adoption of the 2025 California Building Code · Single-Stair/Single-Exit Workgroup final report

  7. Affordable homes for larger families

    Remove the inclusionary code’s prohibition on affordable units with more than three bedrooms. Permit four-bedroom family homes while preserving the affordability obligation, appropriate income and occupancy rules, and equal access to gardens. A four-bedroom home in this design program must be at least 1,700 sq ft. Affordable housing requirements and fee timing

  8. Phasing that a group of small builders can finance

    Keep the full project’s affordable-housing and infrastructure commitments enforceable after subdivision. Study secured phase-by-phase payments instead of collecting the entire elected in-lieu obligation at the first occupancy. Prepare shared-service agreements that remain valid after a sale, refinancing or foreclosure. Affordable housing requirements and fee timing · Parent-parcel standards, shared access and ownership

Read the rules as a coordinated system.

IssueC-NS mixed-use residentialC-C mixed use
Base height35 ft / 3 stories40 ft / 3 stories; 50 ft / 4 stories with a public-hearing use permit
Maximum FARNo maximum under table footnote 33.0; the “no maximum” column applies to residential-only projects
New lot area4,000 sq ft; residential-only lots have a different minimumNo minimum for mixed-use new lots; residential-only lots have a different minimum
Usable open space40 sq ft per dwelling200 sq ft per dwelling; a use permit can reduce it
ApprovalOrdinary mixed-use route requires a public-hearing use permit; separate floor-area threshold at 2,000 sq ftOrdinary mixed-use route requires a public-hearing use permit; separate floor-area threshold at 5,000 sq ft
Residential car parkingNo minimum under the relevant commercial-district schedule, subject to the limited hillside exception. Commercial uses and transit exemptions need a separate check.

District assignment for each study parcel remains to be verified. North Shattuck Commercial district · Corridor Commercial district · Commercial district use permits · Additional commercial district permits · Required parking spaces

Why the combination matters: in a simplified example, five equal floors over 55% of a site yield FAR 2.75; six yield 3.30. The same garden and footprint could therefore pass a 3.0 FAR cap at five floors and fail it at six, even if the height limit were raised. This is an illustration of the arithmetic, not a measured North Shattuck plan. Mixed use, circulation, roof setbacks and floor-area exclusions require actual calculations.

The counterproductive incentive: residential-only and mixed-use projects have different form tables. A policy that forces every building to include retail merely to obtain a workable street wall can produce poorly placed commercial space. A coordinated block option should allow the appropriate ground-floor use on each frontage while keeping its urban form.

Berkeley’s corridor update is the practical local vehicle. The City’s page describes final adoption hearings as forthcoming; this brief does not count its draft provisions as enacted. The online code is consolidated through July 28, 2026, so later ordinances need a Clerk check before a project relies on this baseline. Corridors Zoning Update: North Shattuck, College and Solano

Apply it to North Shattuck carefully.

The concept spans the Safeway, CVS, former Bank of America and Andronico’s sites. Each needs its own parcel and entitlement sheet before district rules, transit rights or a home count can be assigned. The public concept is a design proposition, not a surveyed or approved development.

Study componentDecision to resolve before relying on the plan
Safeway and Andronico’sGrocery continuity, replacement floor area, loading and refuse, leases, construction sequence and independent residential entrances. Keep delivery routes separate from the garden where feasible.
CVS / passage toward WalnutCurrent parcel and title boundaries, any connection through the JCC-side land, permanent access rights, market operations and responsibility for maintenance. Show an alternative if the connection is unavailable.
Former Bank of AmericaCurrent use, title, resource status and boundaries; how a coherent corner building and adjoining courtyard lots work together.
Henry Street and the Shattuck bendPublic right-of-way, traffic and emergency access, accessible sidewalks, crossings, service movements and any hotel-side agreement. The street changes require a public process separate from the building design.
All four sitesDistrict and overlays, housing-element designation, SB 79/transit eligibility, other state pathways, actual net area, utility capacity, protected tenants and resources, and required environmental review.

Apply the architectural brief to actual polygons: ordinary 50–60 ft frontage, a 40 ft-deep street volume, and inward wings no wider than 30 ft. Consolidate corner parcels into coherent chamfered buildings; target about 70 ft of primary frontage excluding the chamfer and generally 50–70 ft of return. Keep at least 5,000 sq ft of net corner parcel after excluding reserved streets, passages and shared courts. Measure footprint separately. These are design targets, not asserted zoning permissions.

Inside family homes, retain private bedroom access from a hall or recess, an entrance vestibule, a larger primary bedroom with ensuite, smaller secondary bedrooms and a compact study with its bedroom-count status stated. Large family kitchens face the courtyard, connect directly to dining and fit a usable island. Small buildings should deliver good homes, not merely more facade divisions.

A practical sequence

  1. Establish the current entitlement baseline. Obtain the latest adopted ordinances and four parcel sheets. Screen local zoning, SB 79, density bonus and other state routes separately.
  2. Test one representative block and building. Run the same measured geometry through the proposed form rules, open-space schedule, fire/access strategy, family layouts and phase plan.
  3. Adopt the local package. Coordinate height, frontages, party walls, shared-court credit, internal subdivision, approvals and the affordable-bedroom amendment.
  4. Run state and delivery work in parallel. Pursue the point-access code path; verify elevators and construction systems; obtain utility, lender and insurer input; complete enforceable common-space and phase agreements.

The local reforms can make the desired form easier to approve. They cannot by themselves solve state exit rules, landowner agreements or the construction pro forma.

All 26 findings

Open a finding for its current rule, proposed action, responsible authority, next step and limits.

Reform needed for the stated scenario

01. Allow the height needed to frame a courtyard block

Published rule / evidence
The published C-NS base table permits mixed use up to 35 ft and three stories; residential-only buildings have a 28 ft/two-story base limit.
Why it matters
The ordinary base envelope does not accommodate the five-to-six-story courtyard study.
Recommended action
Adopt an objective five-to-six-story courtyard envelope where appropriate, coordinating floor-to-floor height, roof equipment, street enclosure and real courtyard daylight. Test boundary transitions against a measured block, rather than applying blanket stepbacks to every small building.
Who can act
Berkeley City Council for zoning; state housing law may provide separate entitlements.
Next step
Confirm each parcel’s district and any adopted corridor amendments; test the local base and applicable state routes separately.
Scope and limits
C-NS base zoning, not a finding about the entitlement of any of the four study sites.
North Shattuck Commercial district
Already enabled within scope

02. Preserve the existing C-NS mixed-use FAR exemption

Published rule / evidence
Footnote 3 to Table 23.204-24 states that mixed-use residential projects have no maximum FAR. The displayed 1.0 FAR must not be applied to that exempt category.
Why it matters
Removing a supposed 1.0 mixed-use cap would misidentify the North Shattuck barrier; height and other standards still matter.
Recommended action
Retain this exemption and make it explicit in the main table and applicant guidance. Calculate capacity from the applicable envelope, open space and building code together.
Who can act
Berkeley Planning Department and City Council.
Next step
Confirm the proposal’s mixed-use classification and produce a capacity schedule with every remaining constraint.
Scope and limits
C-NS mixed-use residential only; this is not unlimited buildability.
North Shattuck Commercial district
Reform needed for the stated scenario

03. Coordinate C-C floor area, height and open space

Published rule / evidence
C-C mixed use has a 3.0 FAR maximum, a 40 ft/three-story base height and a possible 50 ft/four-story height with a public-hearing use permit. Mixed-use open space is 200 sq ft per dwelling, reducible by use permit. Residential-only FAR is uncapped, but separate form limits apply.
Why it matters
A North Shattuck parcel in C-C would face a different capacity test from C-NS; one district’s permission cannot be transferred to another.
Recommended action
For a courtyard-block option, align permitted height and FAR with an actual perimeter-block test, and replace discretionary open-space reductions with an objective shared-garden standard. Do not select a FAR number before measuring site coverage and usable court area.
Who can act
Berkeley City Council.
Next step
Confirm C-C applicability and compare five- and six-story alternatives with unit size, usable court area and commercial floor area.
Scope and limits
C-C mixed-use base standards; applicability to individual North Shattuck parcels remains unverified.
Corridor Commercial district
Reform needed for the stated scenario

04. Give compliant courtyard blocks a predictable approval path

Published rule / evidence
The commercial use table requires a public-hearing use permit for mixed-use and multi-unit residential development. Additional floor-area thresholds trigger public-hearing permits at 2,000 sq ft in C-NS and 5,000 sq ft in C-C. District findings include compatibility and retail continuity.
Why it matters
Even modest buildings can enter discretionary review; separate applications can repeatedly reopen a coordinated block plan.
Recommended action
Create an objective courtyard-block approval option: approve the master form, garden, access, infrastructure and affordability agreement once, then allow conforming building phases administratively. Publish completeness requirements and decision timelines. Preserve applicable state streamlining rights.
Who can act
Berkeley City Council, Planning Department and Zoning Adjustments Board.
Next step
Draft the option alongside the corridor update, with a clear test for which changes require a new master approval.
Scope and limits
Ordinary local approval route; qualifying state or housing-element pathways can differ.
Commercial district use permits · Additional commercial district permits · North Shattuck Commercial district · Corridor Commercial district
Reform needed for the stated scenario

05. Permit homes on quieter frontages without losing the shopping street

Published rule / evidence
C-NS mixed-use ground-floor dwellings must be at least 20 ft from a property line adjacent to a public right-of-way. Residential-only buildings face a separate, more restrictive form table.
Why it matters
A block may need shops on Shattuck but front-door homes on quieter edges. Applying the same commercial frontage treatment around every side can obstruct that mix.
Recommended action
Map the shopping frontages where active commercial space is required. Allow raised ground-floor homes, stoops and vestibules on designated side streets and mews, with objective privacy and accessibility rules and a coherent block envelope.
Who can act
Berkeley City Council.
Next step
Prepare a frontage plan that shows retained or replacement retail, residential entrances, loading and the proposed passages.
Scope and limits
C-NS ground-floor dwelling rule; not a blanket recommendation to remove neighborhood retail.
North Shattuck Commercial district
Reform needed for the stated scenario

06. Distinguish party walls from facing residential windows

Published rule / evidence
C-NS mixed-use setbacks can be zero beside nonresidential districts, but its building-separation footnote invokes 8/12/16 ft by story for residential uses. A mixed-use building also must stand 10 ft from an interior boundary opposite a required habitable-room window. The building-group rule allows some side-setback reductions by administrative use permit.
Why it matters
A continuous street wall depends on distinguishing a blind shared wall from two window-facing walls; internal divisions should not automatically create useless gaps.
Recommended action
Explicitly permit code-compliant blind party walls and zero internal side setbacks within an approved block. Keep objective light, privacy and fire-separation rules for genuine facing windows and the external residential boundary. Obtain a written interpretation of same-site building separation before relying on an existing reduction.
Who can act
Berkeley City Council, Zoning Officer and Building Official.
Next step
Submit paired diagrams: separate legal building lots with party walls, and several buildings on one parent site. Resolve zoning and fire-code treatment for both.
Scope and limits
C-NS and coordinated building-group rules; party-wall construction remains subject to the building code.
North Shattuck Commercial district · Setbacks and coordinated building groups · Building separation in residential districts
Recommended implementation improvement

07. Make one protected shared garden count across the block

Published rule / evidence
C-NS mixed use requires 40 sq ft of usable open space per dwelling; C-C mixed use starts at 200. General rules govern dimensions, access, landscaping and open sky, and exclude required walkways and service areas. Small-lot projects already apply open-space standards at the parent-parcel level.
Why it matters
The code has ingredients for shared space, but a larger block needs certainty that subdivision will not destroy court credit or resident access.
Recommended action
Create a recorded shared-courtyard agreement allocating open-space credit, access, maintenance, replacement reserves and enforcement across the approved buildings. Measure the usable garden separately from mandatory passages, fire access and service areas. Keep the public market passage distinct from the residents’ garden.
Who can act
Berkeley Planning Department, City Attorney and City Council where an ordinance is needed.
Next step
Agree a master open-space schedule and model covenant before subdividing or selling a building parcel.
Scope and limits
Implementation proposal for larger multi-owner blocks; a private covenant alone does not establish zoning credit.
Usable open space · Parent-parcel standards, shared access and ownership · North Shattuck Commercial district · Corridor Commercial district
Reform needed for the stated scenario

08. Let modest building parcels work without fragmenting the corners

Published rule / evidence
Ordinary new C-NS mixed-use lots require 4,000 sq ft; residential-only lots require 5,000. C-C has no minimum for new mixed-use lots, but requires 5,000 sq ft for residential-only lots. Special small-lot pathways have different rules.
Why it matters
A 50–60 ft frontage and roughly 2,000–4,000 sq ft building footprint do not determine the legal lot area. Shared courts and passages can leave smaller net building parcels.
Recommended action
Allow appropriately sized internal building parcels under an approved courtyard-block map while judging capacity and shared open space across the parent site. Consolidate coherent chamfered corners and preserve their larger net parcel area.
Who can act
Berkeley City Council and subdivision authority.
Next step
Measure actual parcel polygons after subtracting reserved streets, passages and shared courts. Test 50–60 ft mid-block frontages; keep corner parcels at least 5,000 sq ft net under the Courtyard Urbanist design brief.
Scope and limits
Local lot minima versus a design study; the 5,000 sq ft corner target is a Courtyard Urbanist requirement, not a universal Berkeley corner rule.
North Shattuck Commercial district · Corridor Commercial district · Parent-parcel standards, shared access and ownership
Already enabled within scope

09. Use Berkeley’s small-lot framework where it actually fits

Published rule / evidence
Chapter 21.30 provides qualifying SB 684 projects a ministerial 60-day map process, applies key zoning standards to the parent parcel and allows 600 sq ft new lots. It recognizes recorded access, fee-simple and other ownership forms, and sale or financing after a dwelling’s building permit is issued. Eligibility and a ten-home limit remain.
Why it matters
Berkeley already recognizes shared access, parent-site compliance and incremental ownership. This is a practical precedent, not permission for a whole high-density block.
Recommended action
Use the existing route for genuinely eligible small projects. Borrow its parent-parcel and recorded-covenant logic when designing a larger local courtyard-block option.
Who can act
Berkeley Planning Department under state subdivision law.
Next step
Check parent acreage, zoning, protected housing, hazards, housing-element density and all eligibility conditions before choosing this route.
Scope and limits
Qualifying Chapter 21.30 projects only. Do not serially split a larger scheme to evade its caps.
Small-lot subdivision eligibility · Small-lot subdivision procedures · Parent-parcel standards, shared access and ownership · Middle Housing Infill Project standards
Recommended implementation improvement

10. Extend coordinated approval beyond ten homes

Published rule / evidence
The special small-lot framework is limited to projects of no more than ten dwellings. Ordinary larger subdivision and development procedures still exist; the special ministerial route is not a general North Shattuck entitlement.
Why it matters
The proposed neighborhood needs many independent buildings to function as one block, with construction and ownership potentially changing over time.
Recommended action
Adopt a larger-block framework covering the master subdivision, shared court, utility easements, independent exits, accessible entrances, temporary edges and enforceable phase obligations. Permit separate builders without restarting the approved land-use analysis for every conforming building.
Who can act
Berkeley City Council, subdivision authority and Building Official; state law governs the map process.
Next step
Pilot the framework on one measured block and publish a model agreement and a small family of code-tested building plans.
Scope and limits
Recommended local program; this report does not establish that larger coordinated projects are currently prohibited.
Small-lot subdivision eligibility · Parent-parcel standards, shared access and ownership · Additional commercial district permits
Already enabled within scope

11. Credit middle-housing reform without overstating its reach

Published rule / evidence
Berkeley’s middle-housing program, effective November 1, 2025, offers eligible two-to-six-unit projects in R-1, R-2, R-2A and MU-R districts a 30-day review without a ZAB or Council appeal. High-fire hillside areas and other eligibility limits matter.
Why it matters
This is real progress for small housing, but it does not make a C-NS five-to-six-story courtyard block automatically approvable.
Recommended action
Carry the program’s objective, predictable review principle into a separate corridor courtyard-block route.
Who can act
Berkeley City Council and Planning Department.
Next step
Keep middle-housing, small-lot and corridor routes separate in the project entitlement matrix.
Scope and limits
Eligible middle-housing projects; not all Berkeley land or all apartment development.
Middle housing zoning
Needs verification

12. Secure a lawful point-access stair pathway

Published rule / evidence
Berkeley adopted the 2025 California Building Code for applications from January 1, 2026. The State Fire Marshal workgroup recommends a constrained four-story single-exit pathway and further research for taller buildings. A workgroup report is not an adopted code amendment.
Why it matters
A compact central stair and lift are important to the shallow, street-to-courtyard building type; five-to-six-story single-stair permission has not been established here.
Recommended action
Pursue a state code pathway for modest point-access buildings with explicit limits and protections: protected stairs, sprinklers, short travel paths, smoke control where required, unit limits, accessible evacuation and fire-service review. Test a compliant interim alternative separately.
Who can act
California Building Standards Commission and State Fire Marshal; Berkeley Building and Fire officials interpret and enforce applicable codes.
Next step
Obtain a written code analysis for a representative building at three, four, five and six stories. Verify current enacted code and legislation before describing any taller single-stair option as allowed.
Scope and limits
State-code reform and project code analysis; zoning height does not authorize an exit arrangement.
Adoption of the 2025 California Building Code · Single-Stair/Single-Exit Workgroup final report
Needs verification

13. Test each independent building’s full fire and construction strategy

Published rule / evidence
The adopted state building code and Berkeley amendments govern building classification. This review has not established project-specific exit count, rated party walls, opening limits, allowable area, sprinkler system or construction type.
Why it matters
Drawing separate facades does not create legally independent buildings. Shared structure, circulation and fire walls can change the code analysis and cost.
Recommended action
Prepare a repeatable building-code matrix for genuine independent buildings, including party-wall structure and fire ratings, permitted openings, exits, sprinkler supply, height and area. Compare costs before selecting a construction system.
Who can act
Project architect and fire-protection engineer, Berkeley Building and Fire officials, and state agencies where reform is required.
Next step
Test a 50–60 ft frontage, 40 ft-deep street volume and any inward wing no wider than 30 ft. Provide no openings through party walls.
Scope and limits
Unresolved technical design questions; no assumed fire-code waiver or automatic podium requirement.
Adoption of the 2025 California Building Code
Needs verification

14. Make compact buildings accessible with workable elevators

Published rule / evidence
Applicable accessibility and elevator requirements must be established under the adopted building code and state equipment rules. Cab sizes, stretcher provisions, installation approval and operating costs have not been verified for these buildings.
Why it matters
Repeating an unnecessarily expensive core across many modest buildings could undermine the delivery model; deleting access is not an acceptable solution.
Recommended action
Develop an accessible entrance, stair and lift prototype; compare legally accepted elevator systems, shaft dimensions and maintenance costs. Seek state changes only where a documented requirement prevents a safe, accessible lower-cost solution.
Who can act
Berkeley Building Official, California elevator authorities and the design team.
Next step
Obtain supplier quotations and written code determinations for each proposed height and occupancy.
Scope and limits
No claim that elevators can be omitted or a particular imported system is permitted.
Adoption of the 2025 California Building Code
Already enabled within scope

15. Keep the residential parking reform Berkeley already has

Published rule / evidence
The parking schedule requires no residential car parking in commercial districts and for the residential portion of mixed-use buildings, subject to the code’s limited hillside exception.
Why it matters
Mandatory residential parking is not the principal obstacle to a North Shattuck courtyard block. A large garage should not be treated as a default entitlement requirement.
Recommended action
Retain the exemption and plan any voluntarily supplied parking, accessible spaces, bicycles and deliveries on their own merits. Prioritize a usable green interior and safe street access.
Who can act
Berkeley City Council and Planning Department.
Next step
Document the applicable exemption in the project brief before designing a garage.
Scope and limits
Residential parking minimums in the stated categories; commercial parking and other access requirements need their own check.
Required parking spaces
Needs verification

16. Verify the commercial transit exemption separately

Published rule / evidence
The local schedule generally starts at two commercial spaces per 1,000 sq ft in the relevant commercial districts. Berkeley’s transit provision and AB 2097 can remove minimums for qualifying developments near major transit stops. Site-specific qualification has not been demonstrated here.
Why it matters
Grocery stores and other commercial space can raise a different parking question from the homes above them.
Recommended action
Prepare a parcel-specific transit eligibility determination. Where a mandate remains, consider removing it or allowing shared off-site supply; retain accessible parking and bicycle requirements as applicable.
Who can act
Berkeley Planning Department; California law controls the state exemption.
Next step
Verify qualifying transit service, statutory distance and exceptions using the current definitions. Do not equate a nearby bus stop with automatic eligibility.
Scope and limits
Commercial components of the four-site study; no verified parking count or transit entitlement.
Required parking spaces · Parking applicability and transit exemption · AB 2097 technical advisory
Reform needed for the stated scenario

17. Allow four-bedroom affordable family homes

Published rule / evidence
BMC 23.328.030 requires the applicable affordable units to broadly match market-rate unit types and average size, but expressly bars affordable units with more than three bedrooms. It also protects equal access to common amenities and perpetual affordability.
Why it matters
That bedroom cap conflicts with including four-bedroom family homes in the affordable portion of a courtyard neighborhood.
Recommended action
Amend the cap to permit four-bedroom and other appropriately sized family units, with suitable income, occupancy and subsidy rules. Preserve affordability and equal garden access. Test financial feasibility rather than lowering housing quality.
Who can act
Berkeley City Council and Housing staff.
Next step
Include four-bedroom affordable homes in the ordinance and financial study. Under the Courtyard Urbanist brief, four-bedroom homes must be at least 1,700 sq ft and have private bedroom access, a primary ensuite and a courtyard-facing kitchen in large family homes.
Scope and limits
Applicable inclusionary projects; the 1,700 sq ft and internal-plan requirements are the design brief, not asserted Berkeley law.
Affordable housing requirements and fee timing
Reform needed for the stated scenario

18. Phase payments without losing the project’s affordable-housing obligation

Published rule / evidence
The inclusionary code generally requires any elected in-lieu fee before the first certificate of occupancy. Chapter 21.30 expressly bars prorating its in-lieu fee across the units. The project obligation survives subdivision and separate sale.
Why it matters
Front-loading the entire obligation can burden the first building in a multi-builder sequence.
Recommended action
For a larger courtyard-block program, study secured proportional payments as each phase opens, with recorded obligations, guarantees and a funded affordability delivery schedule. Preserve the full obligation and prevent later phases from escaping it.
Who can act
Berkeley City Council, Housing staff and City Attorney.
Next step
Compare on-site delivery, land dedication where eligible and in-lieu payment in a phase-by-phase pro forma. Confirm current fee resolutions before quoting dollar amounts.
Scope and limits
Payment timing, not a proposal to evade inclusionary requirements or a verified project fee estimate.
Affordable housing requirements and fee timing · Inclusionary project scope · Parent-parcel standards, shared access and ownership
Already enabled within scope

19. Keep affordability at the whole-project scale

Published rule / evidence
The inclusionary chapter treats relevant contiguous buildings under common ownership or control as one housing project. Its baseline is 20% affordable units, with alternatives and exceptions. Required affordable residents must have access to the same common amenities.
Why it matters
Small building parcels should support varied ownership without removing affordability or privatizing the shared garden away from some residents.
Recommended action
Write one enforceable project affordability plan before selling phases, including equal court access and the timing and location of affordable units. Account for applicable density-bonus units and statutory exceptions.
Who can act
Berkeley Housing and Planning staff.
Next step
Confirm applicability, unit mix, income levels, tenant protections and the chosen compliance option with Housing staff.
Scope and limits
General inclusionary framework, not a site-specific determination of affordable unit counts.
Inclusionary project scope · Affordable housing requirements and fee timing
Needs verification

20. Use the corridor update as the local reform vehicle

Published rule / evidence
The City’s project page says the North Shattuck, College and Solano update is moving toward final adoption hearings after 2026 Planning Commission review. This research did not verify a final effective ordinance replacing the published C-NS table.
Why it matters
Draft height alternatives or objective standards should not be presented as current permissions.
Recommended action
Add the courtyard-block option to the update: coordinated capacity, designated retail frontages, party walls, a shared-garden standard and predictable phased approvals. Test the rules against the North Shattuck geometry before adoption.
Who can act
Berkeley City Council and Planning Commission.
Next step
Obtain the latest ordinance text, adoption date, effective date and parcel map from the City Clerk and Planning staff.
Scope and limits
Policy opportunity and pending verification; an ongoing city initiative does not itself authorize the concept.
Corridors Zoning Update: North Shattuck, College and Solano
Needs verification

21. Screen state entitlements parcel by parcel

Published rule / evidence
SB 79 became applicable to qualifying developments on July 1, 2026. Transit tiers, distance, eligible land and local alternatives matter. SB 79 itself does not make every qualifying project ministerial or exempt from environmental review.
Why it matters
Some sites may already have stronger state capacity rights, but North Shattuck proximity to transit is not sufficient proof.
Recommended action
Prepare a separate eligibility matrix for SB 79, State Density Bonus Law, commercial-corridor housing routes and applicable streamlining. Compare those results with a local courtyard option without combining incompatible assumptions.
Who can act
Berkeley Planning Department, California HCD and the project’s land-use adviser.
Next step
Match each surveyed parcel to the official transit map and current local implementation, then verify the remaining statutory conditions.
Scope and limits
Eligibility screening only; this report establishes no SB 79, density-bonus or ministerial entitlement for a study parcel.
SB 79 transit-oriented development · SB 79 implementation summary
Needs verification

22. Resolve streets, the market passage and servicing as one plan

Published rule / evidence
No site-specific Fire or Public Works acceptance has been obtained for the concept’s street changes, passages, shared loading, refuse collection or emergency access.
Why it matters
The Henry Street mews, Shattuck bend and proposed connection toward Walnut depend on rights-of-way, land agreements, emergency access and daily operations.
Recommended action
Produce one coordinated street and servicing plan: public-street fire access where accepted, hydrants and hose reach, grocery loading, refuse, accessible routes, bicycle storage and market operations. Keep the protected residents’ garden free of routine vehicle servicing where feasible.
Who can act
Berkeley Public Works, Fire, Transportation and Planning; affected landowners and market operators.
Next step
Hold a joint preapplication review and secure the necessary access rights. Show an alternative if the hotel-side access or JCC-side passage cannot be secured.
Scope and limits
Project proposals requiring agency and owner agreement; no assumption that a fire lane must cross the garden or that public land is available.
Adoption of the 2025 California Building Code · Parent-parcel standards, shared access and ownership
Needs verification

23. Coordinate utilities and drainage before parcels are sold

Published rule / evidence
Actual water, sewer, electrical and stormwater capacity, connection charges and off-site upgrade requirements have not been verified for the four study sites.
Why it matters
Uncoordinated meters, trenches and upgrade demands can consume court space and make later building phases dependent on earlier owners.
Recommended action
Prepare a shared infrastructure plan with protected service corridors, reserved equipment space, drainage capacity, allocation of upgrade costs and utility easements. Seek coordinated review and avoid duplicate charges for the same verified work.
Who can act
Berkeley Public Works, EBMUD, electricity provider and other responsible utilities.
Next step
Request capacity letters and current fee schedules for a measured program; distinguish confirmed requirements from estimates.
Scope and limits
Due-diligence and process improvement; no established capacity shortfall or quantified savings.
Parent-parcel standards, shared access and ownership
Needs verification

24. Make small-building ownership financeable

Published rule / evidence
Berkeley’s small-lot code recognizes fee-simple, common-interest, cooperative, community-land-trust and tenancy-in-common forms for qualifying SB 684 projects. That does not establish lender acceptance, insurance cost or a liability exemption for a larger courtyard block.
Why it matters
A shared court must remain secure even when a building is sold, refinanced or foreclosed upon.
Recommended action
Develop a model ownership and easement package with independent building collateral, permanent garden rights, maintenance reserves, dispute resolution and enforceable phase duties. Test it with actual lenders, insurers and affordable-housing partners.
Who can act
Owners, lenders, insurers and legal advisers; Berkeley for local agreements and California for relevant statutes.
Next step
Compare fee-simple building lots, condominium buildings, cooperative and land-trust structures using documented term sheets and legal advice.
Scope and limits
Proposed implementation work; no verified local ban on a particular ownership form or quantified financing premium.
Parent-parcel standards, shared access and ownership
Needs verification

25. Verify operating and construction costs before recommending equipment reforms

Published rule / evidence
This review has not completed a project-specific audit of energy compliance, equipment placement, factory-built certification or repeated plan-review costs.
Why it matters
Those choices can affect roof space, courtyard utility space and the cost of repeating modest buildings.
Recommended action
Cost a repeatable building prototype using accepted systems and coordinate energy, accessibility and fire requirements. Seek reusable approvals where allowed, with clear factory/site inspection responsibility.
Who can act
Berkeley Building Department, relevant state agencies, utilities and suppliers.
Next step
Prepare a cost and compliance schedule with capital and operating costs and source-backed alternatives.
Scope and limits
Research question; no assertion that an energy or off-site construction requirement should be repealed.
Adoption of the 2025 California Building Code
Needs verification

26. Verify the four sites before assigning capacity or a public-land role

Published rule / evidence
The North Shattuck concept studies the Safeway, CVS, former Bank of America and Andronico’s sites. This policy review does not verify their current parcel boundaries, zoning assignments, ownership, leases, protected resources, hazards or public-land status.
Why it matters
A district-level rule cannot establish the capacity or availability of a specific property.
Recommended action
Prepare a separate measured entitlement sheet for each site, including recorded passages, retail continuity, potential displacement, historic resources and any housing-element designation. Retain alternatives where cross-property agreements are unavailable.
Who can act
Berkeley Planning Department, City Clerk, surveyor and project owners.
Next step
Reconcile current survey and GIS with title and agency records. Treat concept yields as preliminary until the combined constraints are tested.
Scope and limits
Four-site North Shattuck concept; no redevelopment approval, ownership assertion or verified home count.
North Shattuck Commercial district · Corridor Commercial district · Corridors Zoning Update: North Shattuck, College and Solano

Scope of this review

Primary sources

  1. North Shattuck Commercial district
    City of Berkeley · 23.204.090 · Published rule or official guidance · Checked 2026-10-20
  2. Corridor Commercial district
    City of Berkeley · 23.204.050 · Published rule or official guidance · Checked 2026-10-20
  3. Commercial district use permits
    City of Berkeley · 23.204.020 · Published rule or official guidance · Checked 2026-10-20
  4. Additional commercial district permits
    City of Berkeley · 23.204.030 · Published rule or official guidance · Checked 2026-10-20
  5. Setbacks and coordinated building groups
    City of Berkeley · 23.304.030 · Published rule or official guidance · Checked 2026-10-20
  6. Building separation in residential districts
    City of Berkeley · 23.304.040 · Published rule or official guidance · Checked 2026-10-20
  7. Usable open space
    City of Berkeley · 23.304.090 · Published rule or official guidance · Checked 2026-10-20
  8. Required parking spaces
    City of Berkeley · 23.322.030 · Published rule or official guidance · Checked 2026-10-20
  9. Parking applicability and transit exemption
    City of Berkeley · 23.322.020 · Published rule or official guidance · Checked 2026-10-20
  10. Small-lot subdivision eligibility
    City of Berkeley · 21.30.050 · Published rule or official guidance · Checked 2026-10-20
  11. Small-lot subdivision procedures
    City of Berkeley · 21.30.040 · Published rule or official guidance · Checked 2026-10-20
  12. Parent-parcel standards, shared access and ownership
    City of Berkeley · 21.30.060 · Published rule or official guidance · Checked 2026-10-20
  13. Middle Housing Infill Project standards
    City of Berkeley · 23.304.160 · Published rule or official guidance · Checked 2026-10-20
  14. Inclusionary project scope
    City of Berkeley · 23.328.020 · Published rule or official guidance · Checked 2026-10-20
  15. Affordable housing requirements and fee timing
    City of Berkeley · 23.328.030 · Published rule or official guidance · Checked 2026-10-20
  16. Adoption of the 2025 California Building Code
    City of Berkeley · 19.28.010 · Published rule or official guidance · Checked 2026-10-20
  17. Middle housing zoning
    City of Berkeley · Eligible districts, two-to-six-unit projects and 30-day review · Published rule or official guidance · Checked 2026-10-20
  18. Corridors Zoning Update: North Shattuck, College and Solano
    City of Berkeley · Project overview and 2026 adoption process · Proposal / official study · Checked 2026-10-20
  19. Single-Stair/Single-Exit Workgroup final report
    California Office of the State Fire Marshal · Recommendations and further research, pp. 25–29 · Proposal / official study · Checked 2026-10-20
  20. AB 2097 technical advisory
    California HCD · Transit proximity and limits on local parking minimums · Published rule or official guidance · Checked 2026-10-20
  21. SB 79 transit-oriented development
    California HCD · Eligibility, July 1, 2026 implementation and local alternatives · Published rule or official guidance · Checked 2026-10-20
  22. SB 79 implementation summary
    Association of Bay Area Governments · July 17, 2026 update; entitlement and review are separate · Published rule or official guidance · Checked 2026-10-20

Explore the Berkeley city report.

The city card places these findings within the same 43 checks used for other cities. Its provisional assessment applies only to the reviewed scenarios.

Open Berkeley’s reform report →